中日韩AV网站秋霞在线一区二区,日韩精品久久久久久免费,人人看人人玩日韩人妻第一页,国产国拍精品亚洲

Welcome to SHENZHEN YLZ ?TECHNOLOGY CO.,LTD.
Hotline
0755-89328605

Industry news

News

Industry news

Transformer production process and process

2021-03-18 01:12:16   Visit:478

In many electronic application scenarios, people will use various types of transformers, whether it is a high-frequency transformer or a low-frequency transformer, the manufacturing process is similar. The following is a senior design engineer Zou Gong of Shenzhen Yingzhe Technology Co., Ltd. to introduce the general production process of transformers?

1: Prepare the corresponding specification drawings required for production.

2: Prepare the materials required for production, verify the specifications of each material, and the manufacturer.

3: According to the order quantity and quality inspection standards, the samples will be made before production and will be handed over to the technical department to confirm the performance and craftsmanship.

4: Start batch production after confirming the qualification.

1) Remove the extra stitches on the skeleton according to the drawings.

2) Winding.

3) Remove the thread or solder the corresponding tap.

4) Tin plating.

5) Magnetic core assembly.

6) Initial test.

7) Impregnation.

8) High pressure test.

9) Finished test.

10) Labeling.

11) External inspection.

12) Quality inspection.

13) Packed and shipped.

For more knowledge about transformers, you can consult MR Zou, a senior design engineer at Shenzhen Yingzhe Technology Co., Ltd.

主站蜘蛛池模板: 林甸县| 吉林省| 肃宁县| 恭城| 绥中县| 翁源县| 富民县| 新营市| 调兵山市| 商水县| 云南省| 酒泉市| 肃南| 通州区| 故城县| 沧源| 格尔木市| 元江| 都兰县| 宜宾县| 临高县| 项城市| 东台市| 肃宁县| 威信县| 得荣县| 陆丰市| 安义县| 邹城市| 上犹县| 贡山| 长沙县| 和龙市| 朝阳区| 渝北区| 吉林省| 九寨沟县| 巨野县| 禄劝| 高唐县| 南华县|